SScottsdale Roof Repairs Call (602) 362-8608
Serving Scottsdale and Maricopa CountyMon–Sat 7am–7pm · (602) 362-8608
Cost

What a New Roof Costs in Scottsdale, Arizona (2026)

Roof replacement cost in Scottsdale depends on one question before any other: are you replacing the roof, or replacing what is under the tile? The two jobs are a factor of two apart in price and most homeowners with a leaking tile roof only need the second one. This post covers both, with 2026 numbers. They are typical ranges for this market, not a quote — your roof's size, pitch and details set the real figure.

If the question is simply how much a new roof is in Arizona, the answer here runs from about $9,000 for a shingle roof on a smaller home to $40,000 or more for new concrete tile, with clay and metal above that. The rest of this post explains where your house falls in that range.

Roofing is priced by the square

A square is 100 square feet of roof surface. A 2,400 square foot single-story home in Scottsdale Ranch with a moderate pitch and overhangs has about 30 to 34 squares of roof; a two-story home of the same floor area has less roof, because the footprint is smaller. Custom homes in Paradise Valley and Troon with multiple levels and deep patios can run 60 to 90 squares. Contractors measure the roof or use aerial measurement, and any quote should state the square count.

2026 per-square prices in Scottsdale

SystemPer square installedNotes
Tile underlayment relay (reuse your tile)$300–$450Most common tile job here
Architectural asphalt shingle$450–$800Tear-off, synthetic underlayment, ridge vent
New concrete tile$900–$1,600Includes underlayment and battens
New clay tile$1,200–$2,200Two-piece mission at the top end
Sprayed foam with coating$600–$1,000Flat and low-slope only
Standing-seam metal$1,000–$2,000HOA approval nearly always needed
Installed price per square in Scottsdale, 2026
  • Tile underlayment relay$300–$450
  • Architectural shingle$450–$800
  • Sprayed foam with coating$600–$1,000
  • New concrete tile$900–$1,600
  • Standing-seam metal$1,000–$2,000
  • New clay tile$1,200–$2,200

Typical ranges, not a quote.

Cost by house size

HomeSquaresRelayShingleNew concrete tile
1,600–2,000 sq ft single-story22–28$8,000–$11,000$10,000–$16,000$20,000–$30,000
2,200–2,800 sq ft single-story30–38$10,000–$15,000$13,000–$22,000$27,000–$40,000
3,000–4,000 sq ft two-story34–45$12,000–$18,000$15,000–$26,000$30,000–$50,000
Large custom, multi-level60–90$20,000–$35,000rarely shingle$55,000 and up

The relay column is the one to look at first if your roof is tile. Tile is the most expensive material on the roof, and a relay reuses it. See tile roof underlayment replacement for what the job includes.

What moves the price up or down

Pitch and complexity. A 4:12 hip roof with four penetrations is fast. An 8:12 roof with six valleys, three skylights, two chimneys and a tile-to-foam transition is not, at the same square count. Steep tile also breaks more during a lift.

Tile breakage on a relay. Typical breakage is 5–10% on concrete tile, higher on 1980s clay. Replacement tile is priced per piece; discontinued profiles come from salvage and cost more. A quote should say how breakage is handled.

Underlayment grade. Single-layer 30-pound felt is the cheapest thing that can be called underlayment, and it is what failed on your roof in the first place. Two-layer SBS-modified or a tile-rated synthetic costs more per square and lasts about twice as long here. The quote should name the product.

Flashings and valley metal. New valley metal, headwall and sidewall flashing, pipe jacks and drip edge, or the old ones reused. Reusing 25-year-old valley metal under new underlayment is a common corner cut on Scottsdale relays and it is invisible from the ground.

Deck repair. Priced per sheet of sheathing, usually $80–$150 installed. Most roofs need none or a few sheets where a leak ran for years. Ask for the rate up front.

Permit. Check with the City of Scottsdale (or the Town of Paradise Valley, Town of Fountain Hills or Maricopa County, depending on the address) whether your job needs a permit and an inspection; most roofers pull it as part of the job. If a permit applies, it is a line item, and a quote without it is a question.

Access. Hillside lots in Fountain Hills, tight side yards in Old Town, a long carry from the street in Desert Mountain.

Season. Summer production is slower — crews are off the roof by early afternoon — and some contractors price it in. Foam and coatings have temperature limits and are best done in spring and fall.

Material notes

What a shingle roof gets you in Scottsdale

Architectural shingles are the cheapest replacement and they are the right choice on the shingle roofs of South Scottsdale and the 1960s–70s homes near Old Town, where the HOA (if there is one) allows them. Understand the lifespan: a shingle rated 30 years elsewhere makes 18 to 22 in our UV. Cool-color shingles with higher solar reflectance help the attic temperature and are worth the small premium. The shingle comparison covers the choices.

Metal and the HOA

Standing-seam metal roofing in Scottsdale is two to three times the cost of shingle, lasts 40 to 50 years, and reflects heat well. On a contemporary rebuild it looks right. The catch is approval: nearly every HOA north of Shea and most of the master-planned communities restrict roof material and color, and a metal roof needs an architectural submittal that can take weeks. Budget the time.

Reading the quotes side by side

Three quotes on the same house that are $6,000 apart are almost never three different prices for the same job. Line them up and check: square count, underlayment product and layers, new or reused flashings, breakage allowance, deck rate, permit, and an ROC license number on the page. The cost page has the same checklist, and questions to ask before you hire covers the contractor side. If a quote is missing three of those items, it is not the low bid; it is an incomplete one.

What changes a new roof cost in Arizona after the quote

Most surprises show up on day one of the tear-off, when the deck is visible for the first time. Ask about each of these before you sign, so the number on the contract stays close to the number on the final invoice:

  • Deck sheets. The per-sheet rate should be written down, along with the roofer's guess at how many sheets the roof needs.
  • Extra layers. A shingle roof with two layers under it costs more to tear off than one with a single layer. Ask how many layers were seen.
  • Broken tile on a relay. Priced per piece, with a stated source for discontinued profiles.
  • Rafter tails and fascia. Sun-split fascia and termite-damaged tails at the eave are carpentry, priced separately.
  • Time. An HOA review or a permit wait doesn't cost money directly, but it moves the start date, and a later start can push a job into summer.

Timing and price

Fall through spring is the comfortable season for roofing here, and it is when most homeowners want the work done. Booking in late summer for an October or November start usually gets a better choice of dates. A job forced by a monsoon leak happens on the roofer's schedule, often with a tarp in between. Summer jobs can be done, with dawn starts and short days, but some contractors price the slower pace in.

Paying for it

Most homeowners pay from savings, a home-equity line or a personal loan; a covered storm loss may pay part. If a contractor's price only makes sense with their own financing partner, ask for the same job in cash terms and compare the two. Get the payment schedule in writing, with the last payment due when the job is finished.

Common questions

Is a relay cheaper than a new tile roof?

Usually by about half, because the relay reuses your tile, the most expensive material on the roof. If the tile is sound and the profile is still available, price the relay first.

How many quotes should I get for a new roof?

Two or three for a replacement. The comparison only works if each one names the underlayment, flashings, deck rate and permit, so ask every roofer for the same items.

When you do not need any of this

If the roof is under 15 years old and the leak has one cause, you need a repair, and it is $300 to $1,500. Repair vs. replacement is the decision post; read that first if you have not already.

← Roof Repair vs. Replacement in Scottsdale: How to DecideHow to Find a Roof Leak From Inside a Scottsdale House →

Need roof work in Scottsdale?

Call for a free estimate. Mon–Sat 7am–7pm.

Call (602) 362-8608
Call (602) 362-8608